Overhaul of the ventilation system in production workshops

Replacement of air handling units and ductwork in three workshops totalling 9,200 m².

  • StatusActive
  • Price376 000 000 UZS
  • Bids accepted until10.10.2026
  • RegionNavoi

T-Y4N72HPublished 23.08.2026

Description

A contractor is required to modernise the ventilation systems of three production workshops.

Scope of work:

  • removal of 2,400 linear metres of existing ductwork;
  • installation of six air handling units with heat recovery;
  • new galvanised steel ductwork;
  • installation of control systems and variable frequency drives;
  • aerodynamic testing and system certification.

Work is carried out in two shifts without stopping production. A method statement and clearance for work at height are required.