Overhaul of the ventilation system in production workshops
Replacement of air handling units and ductwork in three workshops totalling 9,200 m².
- StatusActive
- Price376 000 000 UZS
- Bids accepted until10.10.2026
- RegionNavoi
T-Y4N72HPublished 23.08.2026
Description
A contractor is required to modernise the ventilation systems of three production workshops.
Scope of work:
- removal of 2,400 linear metres of existing ductwork;
- installation of six air handling units with heat recovery;
- new galvanised steel ductwork;
- installation of control systems and variable frequency drives;
- aerodynamic testing and system certification.
Work is carried out in two shifts without stopping production. A method statement and clearance for work at height are required.