Installation of a 35/10 kV transformer substation
Construction and commissioning of a substation for an industrial site in Navoi.
- StatusCompleted
- Price2 350 000 000 UZS
- Bids accepted until18.10.2026
- RegionNavoi
T-50Y0PAPublished 16.09.2026
Description
We need a contractor for the construction and commissioning of a 35/10 kV transformer substation rated 2×6300 kVA for an industrial site.
Scope of work:
- foundations and the indoor switchgear building;
- installation of power transformers and cells;
- 3.2 km of 10 kV cable lines;
- relay protection and telemetry installation;
- commissioning and handover to the energy authority.
Equipment is supplied by the client. A permit for work on installations up to 110 kV and an in-house electrical laboratory are required.